Deliver to
United Kingdom
This is manufactured by GE Critical Power. The manufacturer part number is JRCK017A0S32R064-35Z. It has typical 8 weeks of manufacturer standard lead time. Its typical moisture sensitivity level is 2a (4 weeks). It is available in the standard package of 40. The ge critical power's product offers user-desired applications.
Basket Total:
£ 0