Deliver to
United Kingdom
This is manufactured by Cynergy 3. The manufacturer part number is EXT050G38SS. It has typical 6 weeks of manufacturer standard lead time. It is a type of extension tube accessory. In addition, bulk is the available packaging type of the product. The product is suitable for use with vertical float switches. The cynergy 3's product offers user-desired applications.
For more information please check the datasheets.
Basket Total:
£ 0